Intersection Upgrades

construction

Intersection upgrades are necessary to ensure the shared pathways are safely linked for pedestrians and cyclists utilising the cycling network.

Percentage of construction completed

85%

Project Updates

08 Nov 2021

Changed traffic conditions at intersection of Fernleigh Road and Glenfield Road

As part of the Active Travel Plan project, surveying will be carried out between 9.30am and 12.30 pm tomorrow on the roundabout at Fernleigh Road and Glenfield Road.

During the works some lanes will be closed and a reduced speed limit of 40 km per hour will be in place. The road will be under traffic control.

Motorists are advised to expect delays and to avoid the intersection if possible.

Intersections to be upgraded

Scheduled work dates - 19 July – 30 July 2021 (works to be completed in two stages)
Work status - Complete 
Type of works - Traffic island upgrade + footpath furniture works
Impact to traffic - Lane closures

Traffic island upgrade works - Stage 1

  • South bound turn right lane of Glenfield Road closed. Traffic will still be able to use the left-hand lane as normal as well as to turn right at reduced speed.
  • North bound lane Glenfield Road will have 2m work zone extended into lane traffic will still flow as normal at reduced speed.
  • East bound straight and turn right lane of Fernleigh Road closed. Traffic will still be able to use the left-hand lane as normal as well as to turn right and continue straight at reduced speed.
  • West bound lane Fernleigh Road will have 2m work zone extended into lane traffic will still flow at reduced speed.
  • All other lanes will operate as normal.

Traffic island upgrade works - Fernleigh Road/Glenfield Road intersection

Footpath furniture works - Stage 2

  • South bound turn left / go straight lane of Glenfield Road closed. Traffic will still be able to use the right-hand lane as normal as well as to turn left and go straight at reduced speed.
  • North bound lane Glenfield Road will have 2m work zone extended into lane traffic will still flow as normal at reduced speed.
  • East bound turn left lane of Fernleigh Road closed. Traffic will still be able to use the right-hand lane as normal as well as to turn left at reduced speed.
  • West bound lane Fernleigh Road will have 2m work zone extended into lane traffic will still flow at reduced speed.
  • All other lanes will operate as normal.

Footpath furniture works - Fernleigh Road/Glenfield Road intersection

Scheduled work dates - 22 July – 4 August 2021
Work status - Complete
Type of work - Traffic island upgrade works
Impact to traffic - Lane closure and detours

  • All lanes on Forsyth Street will be closed at the roundabout with Murray Street.
  • Murray Street left turn lane north bound will be closed. Right hand lane will still flow as normal at reduced speed.
  • Western end of Forsyth Street will be open to local traffic only via Docker Street.
  • All other traffic will detour via Morgan Street from Docker Street alternately Docker Street to Gurwood Street.

Traffic island upgrade - Forsyth Street/Murray Street intersection

Scheduled work dates - 2 to 13 August 2021
Work status - Complete
Type of works - Traffic island upgrade + footpath furniture works
Impact to traffic - Lane closures

Scheduled work dates - 24 August to 3 September 2021

Work status - Complete

Type of works -  Traffic island and roundabout furniture upgrade

Impact to traffic - Detours and a reduced speed limit will be in place. The road will be under traffic control.

Scheduled work dates -  24 August to 7 September 2021

Work status - Complete

Type of works - Upgrade of traffic islands and furniture

Impact to traffic -  Detours and a reduced speed limit will be in place. The road will be under traffic control.

Scheduled work dates - 9 to 22 September 2021

Work status - In progress

Types of works - Upgrade of traffic island and roundabout furniture

Impact to traffic - Detours and a reduced speed limit of 40 km per hour will be in place. The road will be under traffic control.

Scheduled work dates - 13 to 27 September 2021

Work status - Pending

Type of works - Upgrade to traffic island and roundabout furniture

Impact to traffic - Detours and a reduced speed limit of 40 km per hour will be in place between 7am and 5pm. The road will be under traffic control.

Scheduled work dates - To be advised

Work status - Pending

Type of works - To be advised

Impact to traffic - To be advised

Documents & Files

Photos & Images

Contact us

For further information about this project please contact our project team on 1300 292 442 or council@wagga.nsw.gov.au