Central Link Update - 22 July

Recently completed works include:

  • 150 lineal metres of new concrete footpath between Narrung Street and the levee.
  • Construction of a 30-metre driveway between the flood pump on Narrung Street.

150 lineal metres of new concrete footpath between Narrung Street and the Levee is completed.

30 metres of driveway constructed to the flood pump at Narrung Street.