Kapooka Link Update - 22 July

Construction of the path from Red Hill Road along Mima Street (south of the rail corridor) to Fernleigh Road (finishing at Pinaroo Drive) is complete. Along with the installation of three pram links to give residents easier access to path.

Three pram ramps have been installed on Mima Street to give residents access to ATP Kapooka Link.