Council is currently in the process of engaging a specialist bridge engineer to consult on the bridge

During the investigation, traffic flow is restricted to one central lane, a give-way sign has been installed to regulate traffic and a reduced speed limit of 60km per hour is in place. The existing load limit remains the same.