We'll be carrying out works at the intersection of Red Hill Road and Plumpton Road from 9-18 September between 7am and 5pm, Monday to Friday, weather permitting.
Detours and a reduced speed limit of 40 km per hour will be in place. The road will be under traffic control.
The works are necessary to ensure the shared pathways are safely linked for pedestrian and cyclists utilising the 56-kilometre Active Travel Plan network.