The multi-million dollar Riverina Intermodal Freight and Logistics (RiFL) Hub project at Bomen in Wagga Wagga has marked another milestone.
More than one million pavers covering 26,000 square metres have been laid for the terminal base beside the new master rail siding.
The focus now is on the finishing touches for the terminal base, such as lighting, electricity and services for the operational interface between the trains, the terminal and the trucks.