Narrung Street Sewage Treatment Works
The Narrung Sewage Treatment Works was commissioned in 1914 as a simple septic tank to service the town. By 1953, extensive works were required to upgrade the facility to keep up with the demand of the growing city of Wagga Wagga.
In the late 1960's the tertiary ponds that now form the Marrambidya Wetlands were extensively remodeled to polish the final discharge before entering the Murrumbidgee River.
Major improvements in aeration times of wastewater after an upgrade to the Narrung Street Sewage Treatment Plant in 2010 resulted in the tertiary ponds (known sludge lagoons) no longer being required. As a result of this redundancy, there was a need to decommission them to meet EPA (Environmental Protection Authority) Licence requirements. The preferred option was the development of a wetland in this location. Examples of similar wetlands are found at Wonga Wetlands at Albury, Fivebough Swamp at Leeton and Gum Swamp at Forbes.
Funding and Initial Design
In 2011, Wagga Wagga City Council secured funding from the NSW Environmental Trust to develop a master plan for the construction of a wetland at the disused ponds of the Narrung Street Sewerage Treatment Works.
The design was adopted by the Council at the July 2015 Council meeting. The meeting also endorsed that the project was to proceed and allocated $737,289 of funding towards completing the wetland. Of this, $200,000 was contributed by Riverina Local Land Services. An additional $90,000 was contributed from Origin Energy.
In addition to the involvement of Council, many organisations have contributed to the success of the Marrambidya Wetland. These include:
- The NSW Environmental Trust
- Riverina Local Land Services
- The Federal Government's Green Army initiative
- Origin Energy
- Local Aboriginal Lands Council
- Wagga Wagga Urban Landcare
Key local stakeholders were engaged to ensure the Marrambidya Wetland would grow into a valuable cultural, environmental and educational site. In July 2015 the Marrambidya Wetland Activities Group was established to allow for representation and involvement in the project from various groups within the city of Wagga Wagga.
The Marrambidya Wetland Advisory Group had representation from:
- Charles Sturt University
- Local Aboriginal Land Council
- Marra Marra
- Mawang Gaway
- Riverina Institute of TAFE
- The Riverina Environmental Education Centre
- Wagga Wagga City Council
- Wagga Wagga Urban Landcare
Transformation from Treatment Ponds to Wetland
See the transformation of the Wetland take shape through the below photos.
Into the Future
It is dreamed that the Marrambidya Wetland will once again be a special place for both indigenous and non-indigenous peoples as they connect to the land. The site should be seen as an opportunity to engage with and learn about our natural environment, and also a space that we can use to reflect upon our own individual connection to country from wherever we reign.
Marrambidya Wetland Timeline
Date | Activity |
---|---|
120,000 years before present | The Wiradjuri People start to settle in the region. |
1829 | Early colonists first sighted the land on which the flourishing City of Wagga Wagga now stands. |
1849 | Wagga Wagga is proclaimed a town. |
1914 | The Narrung Street Sewage Treatment Works were commissioned and serviced the City of Wagga Wagga. |
1946 | Wagga Wagga is proclaimed a city. |
2010 | The Narrung Street Sewage Treatment Works is upgraded under the Sewer2010 project allowing the decommissioning of the sewage treatment ponds. |
2011-2012 | Wagga Wagga City Council receives $100,000 in grant funding from the NSW Environmental Trust to undertake project design, planning and community for the proposed redevelopment of the Narrung Street Sewerage Treatment Ponds |
June 2012 | Upgrade of Narrung Street Sewage Treatment works completed with the installation of a Sequential Batch Reactor, rendering the treatment ponds redundant. |
February - March 2013 | Plans for the Narrung Street Wetland redevelopment go on public exhibition. |
April 2015 | Construction starts on the Narrung Street Sewerage Treatment Ponds |
July 2015 | Wagga Wagga City Council endorses the naming of the wetland as 'Marrambidya Wetland' and submits an application the NSW Geographical Naming Board |
July 2015 | Marrambidya Wetlands Activity Group is formed with representation from Charles Sturt University, The Riverina Environmental Education Centre, Riverina Institute of TAFE, Local Aboriginal Land Council, Wagga Wagga Urban Landcare, Marra Marra, Mawang Gaway and Wagga Wagga City Council |
13 February 2016 | The Healing Place is officially opened to the community on the 8th anniversary of Apology Day. |
June 2016 | The Marrambidya Wetland is officially opened with an official ceremony on Friday 3 June. A community celebration event was held at the wetland on Sunday 19 June. |